For the best experienceDownload the Mobile App
App Store Play Store
Sole bidder for new Interstate 5 bridge includes contractor behind Oregon cost overruns
Sole bidder for new Interstate 5 bridge includes contractor behind Oregon cost overruns
Sole bidder for new Interstate 5 bridge includes contractor behind Oregon cost overruns

Published on: 11/18/2026

This news was posted by Oregon Today News

Go To Business Place

Description

The Interstate 5 Bridge is seen from Vancouver on April 30. The massive project to replace the bridge is on track to be designed by a trio of companies, including one with a recent history of bridge cost overruns.

The massive project to replace the Interstate 5 bridge connecting Oregon and Washington is on track to be designed by a trio of companies, including one with a recent history of bridge cost overruns in Oregon and across the country.

News Source : https://www.oregonlive.com/politics/2026/11/sole-bidder-for-new-interstate-5-bridge-includes-contractor-behind-oregon-cost-overruns.html

Other Related News

11/18/2026

Since LuckyLand Slots ended its services in September it rebranded as LuckyLand Casino Wer...

11/18/2026

An iconic restaurant chain known for its Chicago-style hot dogs and Italian beef sandwiche...

11/18/2026

Salem OR -- Oregon is joining 13 states in a lawsuit to block the merger of two veterinary...

11/18/2026

Oregon economists report a relatively unchanged forecast for the upcoming legislative sess...

ShoutoutGive Shoutout
500/500